Power Networks Design and Construction Guidelines
NP001.1 Design and Construction of Network Assets - General Requirements
NP001.2 General Specification for Underground Electrical Reticulation
NP001.3 General Specification for Overhead Electrical Reticulation
NP001.4 General Specification for Overhead Rural Residential Subdivisions
NP001.5 General Specification for Overhead Commercial and Industrial Subdivisions
NP001.6 General Specification for URD Subdivisions
NP001.7 Reliability Criteria for Distribution Networks
NP001.8 Handover Documentation
NP001.9 Conditions of Supply to Large Customers
NP001.10 Documentation Requirements
NP003 Power Network Policy Installation Rules V3
NP007 Power Networks Service Rules
NP010 Meter Manual
NP020 Guidelines for Developers of Subdivision and Electricity Infrastructure
NP021 Easement Guidelines
NP027 Capture of Newly Installed Street Lighting
NP041 Guidelines for Electrical Design Consultants
PNWP 030 : The Installation, Connection and Operation of Three Phase Mobile Generator
Standard Drawings
Power Supply Volumes
Water and Sewerage Volumes
Drawing Procedures Volume
Bulletins
News PDFs
Sustainability Training
National Heritage Week 2012
Related links
Installations
Cable Joints & Terminations
Distribution Pillars
Fuses & Switchgear
Earthing
Civil
Indoor Substation
Switching Station
Indoor Substation
Package Substation
Unplanned outages
Planned works
Current bulletins
Standard Drawings
Water Services Connection Code
Report faults and queries online
Report a faulty streetlight
Major projects
East Point Outfall PER
Renewable energy products
Alice Water Smart
Help save the planet!
Darwin River Dam levels
Publications and fact sheets
Home
>
Standard Drawings
>
Power Supply Volumes
>
Vol 02 - Underground Manual
>
Section 2 - Construction Drawings
Section 2 - Construction Drawings
Section 2 - Construction Drawings
Sections Drawings List
Sort Options:
Ammendment Date
Short Name
Ascending
Descending
Collapse All
|
Expand All
Installations
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-1-01.pdf
S02-2-1-01 Unmetered Service Overhead Mains To Underground Mains
4
02/2005
S02-2-1-02.pdf
S02-2-1-02 Unmetered Service Underground
5
07/2005
S02-2-1-03.pdf
S02-2-1-03 URD Services Installation Developers
0
11/1992
Cable Joints & Terminations
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-2-01.pdf
S02-2-2-01 Term. Heatshrink Outdoor 22kV Copper Screened Ass. Detail
4
06/1988
S02-2-2-02.pdf
S02-2-2-02 Term. Heatshrink Outdoor 11kV Belted Ass. Details
3
06/1988
S02-2-2-03.pdf
S02-2-2-03 Term. 3 Core Belted 6.3/11kV & 12.7/12kV Indoor
4
02/2005
S02-2-2-05.pdf
S02-2-2-05 Term. Indoor Bushing Type Assembly Details
3
11/1988
S02-2-2-06.pdf
S02-2-2-06 Term. Indoor Load Break Elbow
2
06/1988
S02-2-2-08.pdf
S02-2-2-08 Heatshrink Outdoor LV Paper Lead 3.5 Core Ass. Detail
2
11/1988
S02-2-2-09.pdf
S02-2-2-09 Heatshrink Indoor LV Paper Lead 3.5 Core Ass. Detail
2
11/1988
S02-2-2-10.pdf
S02-2-2-10 Jointing Heatshrink Instructions Cable Lugs & Links
5
07/2011
S02-2-2-11.pdf
S02-2-2-11 Repair Instructions Sheath & Jacket
3
06/1988
S02-2-2-12.pdf
S02-2-2-12 Jointing Instructions LV XLPE
2
06/1988
S02-2-2-13.pdf
S02-2-2-13 Joint Cable LV 25sq.mm Copper Single Core XLPE
5
04/1990
S02-2-2-14.pdf
S02-2-2-14 Jointing Instructions Copper Control
3
06/1988
S02-2-2-15.pdf
S02-2-2-15 Raychem Preparation Instructions 11/22kV XLPE
1
04/1993
S02-2-2-16.pdf
S02-2-2-16 Raychem Jointing Instructions 11/22kV XLPE
1
04/1993
S02-2-2-17.pdf
S02-2-2-17 White Ant Resistant Joint Box & Comp. Links 11/22kV XLPE
1
06/2005
S02-2-2-18.pdf
S02-2-2-18 Joint Cable LV 185sq.mm Aluminium Single Core XLPE
0
04/1990
S02-2-2-20.pdf
S02-2-2-20 General Jointing Instructions 11 & 22kV Heatshrink Joints
0
12/1995
S02-2-2-21.pdf
S02-2-2-21 Stripping Methods
0
12/1995
S02-2-2-22.pdf
S02-2-2-22 Termimesh Application 11 & 22kV XLPE Cable Joints
1
07/2005
S02-2-2-23.pdf
S02-2-2-23 Sigmaform Jointing Instructions 11 & 22kV XLPE Sheet 1
0
12/1995
S02-2-2-24.pdf
S02-2-2-24 Sigmaform Jointing Instructions 11 & 22kV XLPE Sheet 2
0
12/1995
S02-2-2-25.pdf
S02-2-2-25 Raychem Jointing Instructions 11/22kV XLPE Sheet 1 of 2
1
05/1995
S02-2-2-26.pdf
S02-2-2-26 Raychem Jointing Instructions 11/22kV XLPE Sheet 2 of 2
1
05/1998
S02-2-2-27.pdf
S02-2-2-27 Raychem Jointing Instructions 11kV 3C 300sq.mm Screened PILC to 11kV 3x1C 240sq.mm XLPE Sheet 1 of 3
0
05/1998
S02-2-2-28.pdf
S02-2-2-28 Raychem Jointing Instructions 11kV 3C 300sq.mm Screened PILC to 11kV 3x1C 240sq.mm XLPE Sheet 2 of 3
0
05/1998
S02-2-2-29.pdf
S02-2-2-29 Raychem Jointing Instructions 11kV 3C 300sq.mm Screened PILC to 11kV 3x1C 240sq.mm XLPE Sheet 3 of 3
0
05/1998
S02-2-2-30.pdf
S02-2-2-30 Raychem Jointing Instructions 11kV 3C 400sq.mm Screened PILC to 11kV 3x1C 400sq.mm XLPE Sheet 1 of 3
0
05/1998
S02-2-2-31.pdf
S02-2-2-31 Raychem Jointing Instructions 11kV 3C 400sq.mm Screened PILC to 11kV 3x1C 400sq.mm XLPE Sheet 2 of 3
0
05/1998
S02-2-2-32.pdf
S02-2-2-32 Raychem Jointing Instructions 11kV 3C 400sq.mm Screened PILC to 11kV 3x1C 400sq.mm XLPE Sheet 3 of 3
0
05/1998
S02-2-2-33.pdf
S02-2-2-33 Raychem Jointing Instructions Termimesh Application 11kV PILC - XLPE Joint
0
05/1998
S02-2-2-34.pdf
S02-2-2-34 Raychem Jointing Instructions 11kV 3C, 300 & 400 sq.mm Al Screened PILC Sheet 1 of 3
0
05/1998
S02-2-2-35.pdf
S02-2-2-35 Raychem Jointing Instructions 11kV 3C, 300 & 400 sq.mm Al Screened PILC Sheet 2 of 3
0
05/1998
S02-2-2-36.pdf
S02-2-2-36 Raychem Jointing Instructions 11kV 3C, 300 & 400 sq.mm Al Screened PILC Sheet 3 of 3
0
05/1998
S02-2-2-37.pdf
S02-2-2-37 Raychem Jointing Instructions 11kV 3C, 50 & 185 sq.mm Cu Belted PILC Sheet 1 of 3
0
05/1998
S02-2-2-38.pdf
S02-2-2-38 Raychem Jointing Instructions 11kV 3C, 50 & 185 sq.mm Cu Belted PILC Sheet 2 of 3
0
05/1998
S02-2-2-39.pdf
S02-2-2-39 Raychem Jointing Instructions 11kV 3C, 50 & 185 sq.mm Cu Belted PILC Sheet 3 of 3
0
05/1998
S02-2-2-40.pdf
S02-2-2-40 Raychem Jointing Instructions 11kV 3C, 25, 120 & 240 sq.mm Cu Screened PILC Sheet 1 of 3
0
07/1998
S02-2-2-41.pdf
S02-2-2-41 Raychem Jointing Instructions 11kV 3C, 25, 120 & 240 sq.mm Cu Screened PILC Sheet 2 of 3
0
05/1998
S02-2-2-42.pdf
S02-2-2-42 Raychem Jointing Instructions 11kV 3C, 25, 120 & 240 sq.mm Cu Screened PILC Sheet 3 of 3
0
05/1998
S02-2-2-43.pdf
S02-2-2-43 Raychem Jointing Instructions 11kV 3C 240 sq.mm Screened PILC to 22kV 1C 240sq.mm Cu XLPE Sheet 1 of 3
0
05/1998
S02-2-2-44.pdf
S02-2-2-44 Raychem Jointing Instructions 11kV 3C 240 sq.mm Screened PILC to 22kV 1C 240sq.mm Cu XLPE Sheet 2 of 3
0
05/1998
S02-2-2-45.pdf
S02-2-2-45 Raychem Jointing Instructions 11kV 3C 240 sq.mm Screened PILC to 22kV 1C 240sq.mm Cu XLPE Sheet 3 of 3
0
05/1998
S02-2-2-46.pdf
S02-2-2-46 Raychem Jointing Instructions Sigmaform Termination Instructions 11kV XLPE
0
05/1998
S02-2-2-47.pdf
S02-2-2-47 Raychem Jointing Instructions Sigmaform Termination Instructions 22kV XLPE
0
05/1998
S02-2-2-48.pdf
S02-2-2-48 Joint Cable LV 185/240sq.mm Al Single Core XLPE - Termitex
0
07/2005
S02-2-2-49.pdf
S02-2-2-49 Cable Jointing and Termination Raychem Cable Joining Kit for Single Core With Shear Bolt (5 Sheets)
0
04/2007
S02-2-2-50.pdf
S02-2-2-50 Combined in and outdoor ABB slip on termination
0
10/2005
Distribution Pillars
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-3-01.pdf
S02-2-3-01 LV Fused Type General Arrangement
3
04/2007
S02-2-3-02.pdf
S02-2-3-02 Residential Service Type General Arrange
5
10/2007
S02-2-3-03.pdf
S02-2-3-03 Residential Link Type General Arrangement
6
11/2010
S02-2-3-04.pdf
S02-2-3-04 Panel Street Light Column General Arrangement
1
06/1988
S02-2-3-05.pdf
S02-2-3-05 Residential LV Pillar Orientation
0
11/1992
S02-2-3-06.pdf
S02-2-3-06 Residential Service Type Bare Neutral Arrangement
2
06/1998
S02-2-3-07.pdf
S02-2-3-07 Residential Link Type Bare Neutral Arrangement
3
11/2010
S02-2-3-08.pdf
S02-2-3-08 Striple Fuse Pillar Front Opening (2 Sheets)
10
12/2011
s02-2-3-10.pdf
S02-2-3-10 Street Side Type Pillar Link General Arrangement
1
06/2009
s02-2-3-11.pdf
S02-2-3-11 Street Side Type Pillar Service General Arrangement
1
10/2005
S02-2-3-12.pdf
S02-2-3-12 Distribution Pillars, Striple Fused Pillars, LV Pillar Orientation
0
10/2005
Fuses & Switchgear
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-4-01.pdf
S02-2-4-01 Combination Fuse Switch Outdoor Ground Substation Assembly Details
6
06/1988
S02-2-4-02.pdf
S02-2-4-02 Combination Fuse Switch Outdoor Cable Entry Hood Fabrication Details
3
06/1988
S02-2-4-03.pdf
S02-2-4-03 Combination Switch Exit Panel & Door Clamp Fabrication Details
3
06/1988
Earthing
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-5-01.pdf
S02-2-5-01 Package Substation Metal Clad General Layout
24
12/2011
S02-2-5-02.pdf
S02-2-5-02 Indoor Substation General Arrangement
2
06/1988
S02-2-5-03.pdf
S02-2-5-03 Distribution Pillars Residential Cullen Bay Only
0
08/1993
S02-2-5-05.pdf
S02-2-5-05 Substation Foundation General Arrangement
2
11/2010
S02-2-5-06.pdf
S02-2-5-06 Earthing Ring Main Unit - Construction Details
4
12/2011
S02-2-5-08.pdf
S02-2-5-08 Earthing Kiosk Subsation - Construction Details
6
04/2011
Civil
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-6-01.pdf
S02-2-6-01 Road Crossing & Trenching Notes, All Areas
10
04/2011
S02-2-6-02.pdf
S02-2-6-02 Trench Sections in Footpath Allocations, All Areas
9
04/2011
S02-2-6-03.pdf
S02-2-6-03 Trench Sections Outside of Footpath Allocations, All Areas
10
04/2011
S02-2-6-04.pdf
S02-2-6-04 Package Substation 50kVA 11kV Single Phase Foundation Details
3
06/1998
S02-2-6-05.pdf
S02-2-6-05 B.B.C. Switchgear Support Foundation Details
3
06/1998
S02-2-6-06.pdf
S02-2-6-06 Ring Main Unit Crawford Foundation Details
3
06/1998
S02-2-6-07.pdf
S02-2-6-07 Ring Main Unit Lucy Foundation Details
3
06/1998
S02-2-6-08.pdf
S02-2-6-08 Ring Main Unit Reyrolle Ross Foundation Details
1
06/1998
S02-2-6-09.pdf
S02-2-6-09 Package Substation Cable Entry Foundation Details
18
07/2011
S02-2-6-10.pdf
S02-2-6-10 Standard Cable Pits Plan & Details
1
06/1998
S02-2-6-11.pdf
S02-2-6-11 Package Substation 50kVA 11kV Single Phase Cable & Trench Arrangement
7
06/1998
S02-2-6-12.pdf
S02-2-6-12 Double Transformer Substation Trench & Duct Layout
5
03/1990
S02-2-6-13.pdf
S02-2-6-13 Indoor Substation 1000kVA Maximum Construction Details
7
10/1991
S02-2-6-14.pdf
S02-2-6-14 Indoor Substation Ducts, Drainage & Unistruts Arrangement & Details
4
10/1991
S02-2-6-15.pdf
S02-2-6-15 Indoor Substation Construction Notes
4
11/2008
S02-2-6-16.pdf
S02-2-6-16 Cable Route Markers
8
11/2008
S02-2-6-17.pdf
S02-2-6-17 Substation Easement Details HV & LV Equipment
4
12/2011
S02-2-6-18.pdf
S02-2-6-18 HV Consumers Switching Station Metering Room Construction Details
1
09/1991
S02-2-6-19.pdf
S02-2-6-19 HV Consumers Switching Station Metering Room Construction Notes
2
11/2008
S02-2-6-21.pdf
S02-2-6-21 Chainwire Mesh Security Fence Without Top and Bottom Rails
0
09/1999
S02-2-6-22.pdf
S02-2-6-22 Chainwire Mesh Security Fence With Top and Bottom Rails
0
09/1999
S02-2-6-23.pdf
S02-2-6-23 Ringmain Unit 4 Way RM6 Foundation Detail
1
01/2004
S02-2-6-24.pdf
S02-2-6-24 Ringmain Unit 3 Way RM6 Foundation Detail
2
11/2008
S02-2-6-25.pdf
S02-2-6-25 Ringmain Unit 3 or 4 Way ABB SafeRing Foundation Detail
0
07/2005
S02-2-6-26.pdf
S02-2-6-26 Civil, Concrete Encased Trench Section in Footpath
0
08/2005
S02-2-6-27.pdf
S02-2-6-27 Civil, Cable Route Markers, Kerb
0
08/2005
S02-2-6-28.pdf
S02-2-6-28 Civil, Bollards, Foundation Detail
0
03/2008
S02-2-6-29.pdf
S02-2-6-29 Kiosk Substation 300 - 1000 kVA Cable Entry and Foundation Details
1
11/2008
Indoor Substation
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-7-01.pdf
S02-2-7-01 Duct Cover & Cable Layout Details
3
03/1990
S02-2-7-02.pdf
S02-2-7-02 Louvred Door Elevations & Sections
5
02/2005
S02-2-7-03.pdf
S02-2-7-03 Louvred Door Details & Notes
5
11/2006
S02-2-7-04.pdf
S02-2-7-04 Door Emergency Exit
6
06/2005
S02-2-7-05.pdf
S02-2-7-05 Miscellaneous Services General Arrangement
4
05/2005
S02-2-7-06.pdf
S02-2-7-06 Wall & Busbar Installation Details
2
06/1988
S02-2-7-07.pdf
S02-2-7-07 Double & Single Transformer Switchgear & Cable Duct
1
06/1988
S02-2-7-08.pdf
S02-2-7-08 M.C.C.B & Safety Cage Assembly Details
2
04/2005
Switching Station
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-7-09.pdf
S02-2-7-09 Miscellaneous Services
0
10/1990
S02-2-7-10.pdf
S02-2-7-10 Metering Room Switchgear Layout
1
11/2007
S02-2-7-11.pdf
S02-2-7-11 HV Metering Single Line & Schematic Diagram
0
11/1994
Indoor Substation
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-7-12.pdf
S02-2-7-12 One T/fomer Surface Chamber Layout Plan
0
03/1998
S02-2-7-13.pdf
S02-2-7-13 One T/fomer Surface Chamber Option 1 Sheet 1
1
11/2009
S02-2-7-14.pdf
S02-2-7-14 One T/fomer Surface Chamber Option 1 Sheet 2
0
03/1998
S02-2-7-15.pdf
S02-2-7-15 One T/fomer Surface Chamber Option 1 Sheet 3
0
03/1998
S02-2-7-16.pdf
S02-2-7-16 One T/fomer Surface Chamber Option 2 Sheet 1
1
11/2009
S02-2-7-17.pdf
S02-2-7-17 One T/fomer Surface Chamber Option 2 Sheet 2
0
03/1998
S02-2-7-18.pdf
S02-2-7-18 One T/fomer Surface Chamber Option 2 Sheet 3
0
03/1998
S02-2-7-19.pdf
S02-2-7-19 One T/fomer Surface Chamber Option 3 Sheet 1
1
11/2009
S02-2-7-20.pdf
S02-2-7-20 One T/fomer Surface Chamber Option 3 Sheet 2
0
03/1998
S02-2-7-21.pdf
S02-2-7-21 One T/fomer Surface Chamber Option 3 Sheet 3
0
03/1998
S02-2-7-22.pdf
S02-2-7-22 One T/fomer Surf Ch Construction Notes Sheet 1
0
03/1998
S02-2-7-23.pdf
S02-2-7-23 One T/fomer Surf Ch Construction Notes Sheet 2
2
05/2008
S02-2-7-24.pdf
S02-2-7-24 Two T/fomer Surface Chamber Layout Plan
0
03/1998
S02-2-7-25.pdf
S02-2-7-25 Two T/fomer Surface Chamber Option 1 Sheet 1
1
05/2010
S02-2-7-26.pdf
S02-2-7-26 Two T/fomer Surface Chamber Option 1 Sheet 2
0
03/1998
S02-2-7-27.pdf
S02-2-7-27 Two T/fomer Surface Chamber Option 1 Sheet 3
2
09/2006
S02-2-7-28.pdf
S02-2-7-28 Two T/fomer Surface Chamber Option 2 Sheet 1
1
05/2010
S02-2-7-29.pdf
S02-2-7-29 Two T/fomer Surface Chamber Option 2 Sheet 2
0
03/1998
S02-2-7-30.pdf
S02-2-7-30 Two T/fomer Surface Chamber Option 2 Sheet 3
0
03/1998
S02-2-7-31.pdf
S02-2-7-31 Two T/fomer Surface Chamber Option 3 Sheet 1
1
12/2009
S02-2-7-32.pdf
S02-2-7-32 Two T/fomer Surface Chamber Option 3 Sheet 2
0
03/1998
S02-2-7-33.pdf
S02-2-7-33 Two T/fomer Surface Chamber Option 3 Sheet 3
0
03/1998
S02-2-7-34.pdf
S02-2-7-34 Three T/fomer Surface Chamber Layout Plan
0
03/1998
S02-2-7-35.pdf
S02-2-7-35 Three T/fomer Surface Chamber Option 1 Sheet 1
0
03/1998
S02-2-7-36.pdf
S02-2-7-36 Three T/fomer Surface Chamber Option 1 Sheet 2
0
03/1998
S02-2-7-37.pdf
S02-2-7-37 Three T/fomer Surface Chamber Option 1 Sheet 3
1
12/2009
S02-2-7-38.pdf
S02-2-7-38 Three T/fomer Surface Chamber Option 1 Sheet 4
0
03/1998
S02-2-7-39.pdf
S02-2-7-39 Three T/fomer Surface Chamber Option 2 Sheet 1
1
09/2006
S02-2-7-40.pdf
S02-2-7-40 Three T/fomer Surface Chamber Option 2 Sheet 2
1
12/2009
S02-2-7-41.pdf
S02-2-7-41 Three T/fomer Surface Chamber Option 2 Sheet 3
0
03/1998
S02-2-7-42.pdf
S02-2-7-42 Three T/fomer Surface Chamber Option 3 Sheet 1
1
09/2006
S02-2-7-43.pdf
S02-2-7-43 Three T/fomer Surface Chamber Option 3 Sheet 2
1
12/2009
S02-2-7-44.pdf
S02-2-7-44 Three T/fomer Surface Chamber Option 3 Sheet 3
0
03/1998
S02-2-7-45.pdf
S02-2-7-45 Cable Pulling Eye Detail
0
03/1998
S02-2-7-46.pdf
S02-2-7-46 Earthing Layout Sheet 1
1
09/2006
S02-2-7-47.pdf
S02-2-7-47 Earthing Layout Sheet 2
0
03/1998
S02-2-7-48.pdf
S02-2-7-48 LV Connection Details
1
03/2005
S02-2-7-49.pdf
S02-2-7-49 Individual Transformer LV Connection Details
0
03/1998
S02-2-7-50.pdf
S02-2-7-50 One T/former Surface Chamber Option 1 Misc Details
1
03/2005
S02-2-7-51.pdf
S02-2-7-51 One T/former Surface Chamber Option 2 Misc Details
1
03/2005
S02-2-7-52.pdf
S02-2-7-52 Two T/former Surface Chamber Option 1 Misc Details
1
03/2005
S02-2-7-53.pdf
S02-2-7-53 Two T/former Surface Chamber Option 3 Misc Details
1
03/2005
S02-2-7-54.pdf
S02-2-7-54 Three T/former Surface Chamber Option 1 Misc Details
1
03/2005
S02-2-7-55.pdf
S02-2-7-55 Three T/former Surface Chamber Option 2 Misc Details
1
03/2005
S02-2-7-56.pdf
S02-2-7-56 Three T/former Surface Chamber Option 3 Misc Details
1
03/2005
S02-2-7-57.pdf
S02-2-7-57 RMU 3&4 Function Mounting Frame
0
11/2006
Package Substation
File Name
Drawing Title
Amnt #
Amnt Date
S02-2-8-01.pdf
S02-2-8-01 LV Compartment General Arrangement
0
07/2006
S02-2-8-02.pdf
S02-2-8-02 HV Compartment General Arrangement
5
12/2011
S02-2-8-03.pdf
S02-2-8-03 MCCB mounting, Low Voltage Compartment, General Arrangement
0
12/2011